02.04.2012 08:47 |
"HydroTech Engineering" Ltd. Co is preparing for commissioning of ultrafiltration plant (1,200 m3/ h) and electro deionization plant (150 m3/ h).
Earlier, we have installed the Reverse Osmosis plant with capacity of 150 m3/h.
An article in the newspaper "Our Newspaper" № 4 (89) March, 2012.
|